Application of Duration Measure in Quantifying the Sensitivity of Project Returns to Changes in Discount Rates

Yousefi, Vahidreza and Yakhchali, Siamak Haji and Tamošaitienė, Jolanta (2019) Application of Duration Measure in Quantifying the Sensitivity of Project Returns to Changes in Discount Rates. Administrative Sciences, 9 (1). p. 13. ISSN 2076-3387

[thumbnail of admsci-09-00013-v2.pdf] Text
admsci-09-00013-v2.pdf - Published Version

Download (3MB)

Abstract

In this research, the concept of Duration with a new application in project management has been defined. The Duration of each project provides the project manager with a combined measure containing concepts of return, cost and time of the project. Further in this article, the changes in project return, based on different assumptions such as discount rate, have been examined. To examine the effect of the changes in these factors, the Monte Carlo simulation has been used. The relationship between these factors is nonlinear which reflects the great importance of investment on appropriate risk management systems. The data from a set of construction projects have been used in order to verify the results of this study. Similar relationships can be expected to exist in other industries as well.

Item Type: Article
Subjects: Eprints STM archive > Multidisciplinary
Depositing User: Unnamed user with email admin@eprints.stmarchive
Date Deposited: 15 Jul 2023 05:42
Last Modified: 13 Oct 2023 04:17
URI: http://public.paper4promo.com/id/eprint/893

Actions (login required)

View Item
View Item